China Wholesale Ev Charger 11kw Manufacturers – European Standard AC Charing Pile 7KW/14KW/22KW/44KW – Yile
China Wholesale Ev Charger 11kw Manufacturers – European Standard AC Charing Pile 7KW/14KW/22KW/44KW – Yile Detail:
Specification
Type: YL-AC-7KW plastic version
Dimension: 450*130*305mm
User Interface: 4.3 inch highlight display
AC Power: 220Vac±20%; 50Hz±10%;L+N+PE
Rated Current: 32A
Output Power: 7KW
Working Condition Elevation: ≤2000m;Temperature: -20℃~+50℃
Charging Mode: Offline no billing, offline billing, oline billing
Protection Function Overvoltage, undervoltage, overcurrent, short circuit, surge, leakage,etc.
Cable Length: 5m
Installation: Wall-mounted or floor-mounted installation
Protection Level: Ip54
Excutive standard: IEC 62196, SAE J172
Scope of Application
The AC charging station provides a 230V single phase AC 50Hz, power supply for charging electric vehicles with on-board chargers. It is mainly suitable for the following places: Large, medium and small electric vehicle charging stations; Urban residential areas, shopping squares, electric power business places and other public places with electric vehicle parking spaces; Motorway service area, station wharf and other transportation hub areas; Real estate and project construction acceptance needs.
Why Choose Us We Ensure*Safety Design
*Current Leakage Protection
*PME Earth Fault Monitoring
*Multiple Earthing Schemes Compliant
*Professional Web Configuration
*Load Balancing
FAQ
Q: What is your terms of payment?
A: T/T, L/C
Q: Do you test all your chargers before shipping?
A: All major components are tested before assembly and each charger is fully tested before shipped
Q: Can I order some samples? How long?
A: Yes, and usually 7-10 days to production and 7-10 days to express.
Q: How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
Q: Are you Trading Company or manufacturer?
A: We are professional manufacturer without our own factory located in Hangzhou
Product detail pictures:
Related Product Guide:
Our firm promises all consumers with the first-class products as well as most satisfying post-sale services. We warmly welcome our regular and new consumers to join us for China Wholesale Ev Charger 11kw Manufacturers – European Standard AC Charing Pile 7KW/14KW/22KW/44KW – Yile, The product will supply to all over the world, such as: Israel, Iraq, Munich, We have a good reputation for stable quality products, well received by customers at home and abroad. Our company would be guided by the idea of "Standing in Domestic Markets, Walking into International Markets". We sincerely hope that we could do business with customers both at home and abroad. We expect sincere cooperation and common development!
By Megan from Bolivia - 2017.02.18 15:54
The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
By Joseph from Sacramento - 2017.02.18 15:54